Construction Project Updates

Due to the faithful and generous donations of our supporters, particularly at Powerhouse Christian Church, we're constructing a permanent 50-bed facility to house the Petionville Children's Home. You can see all the latest updates on the project here, from an empty piece of land to the latest nail hammered down. Thank you to all those who are contributing to truly make this their home!

 

 

Bunk Beds and More!

The work on the new home is progressing as the needed funds come in. We were blessed to have a team from Alabama visit and give a hand building the needed bunk beds for the new children that will be taken in when the new room is finished.  Thanks to Jim Kane and his team for all their assistance!  You can see from the photos below the way the upper courtyard is shaping up and the great masonry work being done on the upper level of the building! 

  • bunk bed
  • bunkbeds
  • front courtyard
  • outside finishing work continues
  • outside masonry work continues
  • upper court masonry work
  • upper courtyard
  • upper front courtyard progresses
  • upper level construction
  • upper level
  • upper room 1
  • upper room
  • upper rooms

Construction Progress Continues....

With all of our 20 children now moved into the finished basement level of their new home, the work on the upper level continues. The pictures below show the work that still needs to be done. When the upper level is complete in the present project phase, the home will be able to accommodate approximately 50 children. The roof level will eventually be enclosed in the final phase of the project. 

  • basement level  outside stairway to front courtyard
  • basement level - looking up
  • basement level - outdoor play area
  • basement level - side courtyard
  • basement level looking up
  • basement level side court
  • cement mixing
  • cement
  • enclosing outdoor kitchen area
  • front courtyard view from roof
  • front courtyard view from roof2
  • front courtyard-generator platform with well area in front
  • front courtyard
  • front courtyard3
  • generator quest
  • generator
  • indoor eating area
  • outside shower toilet area
  • roof view
  • roof view2
  • roof view4
  • upper level unfinished classroom
  • upper level unfinished room2
  • upper level unfinished room3
  • upper level unfinished room4
  • upper level unfinished room5
  • upper level unfinished rooms

A New Home!

All 20 kids have now been moved into the completed basement level of their permanent facility. The work continues on the upper level where all the kids attend school in the unfinished classrooms in the front courtyard. You can see from the photos below the beautiful work that has been done on the basement level of their new home! There are more children waiting to be taken in as soon as the construction on the upper level is complete.

 

  • back entrance into basement eating area - upper level construction still in progress
  • building the school desks
  • darvensley and angelina with jean paul
  • front gate cement work
  • in class learning the alphabet in english
  • in school
  • inside eating area
  • lunch outdoors
  • mixing cement all by hand
  • outside bathrooms and shower next to outdoor kitchen
  • side entrance to finished basement level
  • side steps going down to finished basement level
  • the older girls hard at work in school
  • wor caretakers -- joane - julienne - nana - kettia

 

 

 

Thank You!

pastor wilson.jpgThank you so much for standing with us at Wings of Refuge Children's Home. We were so happy to move the kids into their new home on December 26th. I can see already the changes on their faces that they are so happy. In fact, I am too! We also want to thank Holly and her church for the generator which was a very big challenge to us. Thank you on behalf of Wings of Refuge of Haiti. God bless you.                                                                                                     --Pastor Wilson

 

 

 

 

 

 

 

 

Basement Finishing Work Continues

  • laying the tile floor
The basement level of the new Wings of Refuge Children's Home is nearing completion. Below are some photos of the floors and walls being worked on. It's beginning to take shape and we are so excited to be moving the kids in by the end of this month! 
  • ceiling work
  • exterior
  • looking good
  • outside play area
  • outside toilets
  • pastor inspects the work
  • playground area
  • safety wire goes up
  • tile floor goes in
  • tile for flooring
  • tile work
  • walls get finished

 

 

 

The Home Stretch!

  • at church sunday morning
  • the kids singing at pastor wilsons church
After about 9 months from our groundbreaking, the Wings of Refuge Children's Home basement is just about ready! The kids are so excited to be moving into their new home. As you can see from the photos below, everything is shaping up quite nicely as the basement work is just about complete. The move-in date is scheduled for December 24th! What a blessing it will be for the kids to celebrate Christmas day in their new home! 
  • comfy and cozy
  • finished tile work
  • interior bathroom
  • interior finishing work
  • interior
  • kitchen
  • outside toilets
  • roof water pump system

 

 

 

 

 

Basement Interior and Exterior Finishing Work

The finishing work on the Basement Level of the new Wings of Refuge Children's Home has begun. Plans have changed a bit in order to be able to move the kids into their new home by November. The basement level will now house all 21 of the Wings of Refuge children. In order to accommodate them all, the kitchen will now be built outside. It is a very common occurrence in Haiti to have a kitchen facility right outside and nearby the main house. This will allow for more rooms to be built inside for the kids. The plastering of the interior and exterior walls has begun, pipes are being run for the plumbing, and electricity is being installed. The work is tedious, but pretty soon it will really start looking like "their home."

  • basement exterior
  • basement interior finishing work
  • basement interior work is progressing
  • basement walls and ceilings getting plastered
  • cement for the basement interior work
  • dining hall
  • exterior basement
  • exterior finishing work
  • future clinic
  • girls dorm
  • outdoor kitchen
  • tedious work